Navy Pier Marina construction starts, on track for 2025 opening

Boaters from Chicago and around Lake Michigan and the Great Lakes along with boating groups seeking unique and modern mooring facilities will find a home in the heart of Chicago.

The building was designed to fit in harmony with Navy Pier, providing a modern facility with a retro look while utilizing shipping containers that are traditionally single-use and a burden on the environment unless repurposed. S.I. Container Builds is the marina amenities building container contractor.

Full story here: https://navypiermarina.com/news/navy-pier-marina-breaks-water-construction-commences/

Read about it in the Chicago Sun Times and on WGN

https://wgntv.com/news/wgn-investigates/chicago-navy-pier-marina-construction-wgn-investigates/

If you are interested in building with steel-frame, shipping container technology, contact us here.

Previous
Previous

Construction energy use can be reduced by 40-60% for a container home

Next
Next

Palatine site to become group home for human trafficking survivors